Scheme- MIDH - ..........Incentives/Assistance
Activity | Unit | Rate of Assistance | |
Plantation Infrastructure and Development | |||
b. Small Nursery (1ha) Public Sector | Nos | 15.00 | |
c. Small Nursery (1ha) Private Sector | Nos | 7.50 | |
d. Upgrading nursery infrastructure to meet accreditation norms in Public sector (1 ha) | Nos | 2.50 | |
e. Open Pollinated Crops (Public sector ) Vegetables. | Ha | 0.35 | |
f. Import of Plant Material | P.B |
| |
Area Expansion |
|
| |
a. High Density Plantation (Apple/Mango/Litchi/Guava/Citrus) | Ha | 0.30 | |
Normal Spacing fruit plantation |
|
| |
Without integration 60:20:20 | Ha | 0.18 | |
Incentive (1st year) | Ha | 0.06 | |
Incentive (2st year) | Ha | 0.06 | |
Rejuvenation/replacement of senile plantation, canopy mgt. | Ha | 0.20 | |
Creation of Water Sources |
|
| |
a. Water harvesting system for individuals for storage of water in 20x20x3m,pond/tube wells/dug wells @ 100/ cum. | Nos | 0.90 | |
Protected Cultivation |
|
| |
a. Fan and Pad System | Sq.Mtr | 0.0094875 | |
b. Tubular Structure(50% cost for a maximum area of 4000 sq.Mtr per beneficiary) | Sq.Mtr | 0.006095 | |
c. Wooden Structure (200 Sq. Mtr per beneficiary) | Sq.Mtr | 0.003105 | |
d. Bamboo Structure(200 Sq. Mtr per beneficiary) | Sq.Mtr | 0.003000 | |
e. Plastic Mulching( 50% of the total cost limited to 2 ha per beneficiary | Ha | 0.184 | |
Shade Net Houses |
|
| |
a. Tubular Structure(50% cost for a maximum area of 4000 sq.Mtr per beneficiary) | Sq.Mtr | 0.00408 | |
b. Anti Bird/Anti hail nets(50% cost limited to 5000 sq.mtr per beneficiary) | Sq.Mtr | 0.000175 | |
Cost of planting material and cultivation of Carnation/Gerbera under poly house/shade net house.(50% of cost limited to 4000 sq.mtr per beneficiary) | Sq.Mtr | 0.00305 | |
Cost of planting material and cultivation of Rose and Lium under poly house/shade net house.(50% of cost limited to 4000 sq.mtr per beneficiary) | Sq.Mtr | 0.00213 | |
Promotion of Integrated Nutrient Management (INM) Integrated pest Management (IPM) |
|
| |
a. Promotion of IPM/INM(30% of cost subject to a maximum of Rs.1200/ha limited to 4.00 ha /beneficiary | Ha | 0.012 | |
Organic farming |
|
| |
Vermi Compost unit | Nos | 0.50 | |
HDPE Vermibeds | Nos | 0.08 | |
Bee Keeping |
|
| |
Bee Colonies | Nos | 0.008 | |
Bee Hives | Nos | 0.008 | |
Honey Extractor | Nos | 0.20 | |
Centre of Excellence for Horticulture |
| 1000.00 | |
Horticulture Mechanization |
|
| |
a. Tractor upto 20 PTO HP | Nos | 1.0 | |
b. Power tiller below 8 BHP | Nos | 0.50 | |
c. Power Tiller (8 BHP and above) | Nos | 0.75 | |
d. Self Propelled Horticulture Machinery | Nos | 1.25 | |
e. (Powered Operated Taiwan Sprayer capacity more than 16 Litre) | Nos | 0.10 | |
Human Resource Development/Training of farmers |
|
| |
a. Within State(Rs.1000/day per farmer including transport | man days | 0.010 | |
b. Outside State (Proejct based as per actual) 100% of cost | P.B | 0 | |
Exposure visit of Farmers |
|
| |
a. Outside State (Proejct based as per actual) 100% of cost | P.B | 0 | |
Training of Technical Staff |
|
| |
a. Within the state(Rs.300/- per day participant plus TA/DA as admissible (100% of the cost) | Nos | 0.0130 | |
b. Study tour to progressive States/units (group of minimum 5 participants), Rs.800/- per day participant plus TA/DA as admissible (100% of the cost) | Nos | 0.028 | |
c. Outside India | No | 6.00 | |
Integrated Post Harvest Management |
|
| |
a. Pack House | Nos | 2.00 | |
b. Integrated Pack House | Nos | 25.00 | |
c. Static and Mobile Vending Cart/Platform with cool chamber | Nos | 0.15 | |
d. Refrigerated Transport vehicle | Nos | 13.00 | |
e. Preservation Unit (Low Cost) | Nos | 1.00 |